BLOQ42 powered by CLOU · Midea Group
Your battery storage specialist.
For commercial and industrial sites, from 233 kWh to 6.25 MWh per unit. We do it all: sizing, planning, permits and applications, installation, service and maintenance. One partner for everything, with systems by CLOU Electronics of the Midea Group.
3 × 261 kWh, 783 kWh in total
Solutions.
One storage system, three typical jobs. Choose what fits your site.
Shave peaks, use your own solar power.
Storage from 233 kWh to 6.25 MWh for manufacturing, logistics, retail and data centres. Cuts demand charges and raises self-consumption.
See the systems → Residential complexesYour tenants want to charge. Your grid connection can’t cope.
Charging points for every parking space without costly grid upgrades. Plus solar power for your tenants through a self-consumption community (ZEV).
For landlords & owners → Charging parksMegawatt charging on your existing connection.
For truck depots, fuel stations, hotels and retail: the battery supplies the peak when several vehicles charge at once.
For charging park operators →The Midea Group stands behind every system.
A battery storage system runs for 15 years and more. A warranty is only worth as much as the manufacturer who can still honour it 15 years from now. CLOU Electronics belongs to the Midea Group, one of the world’s largest technology groups, which also owns the German robot maker KUKA.
Source: Midea Group.
In 2026, TÜV SÜD assessed five CLOU storage systems, including Aqua-E261 and Aqua-C3.0, in an independent technical due diligence covering technology, manufacturing, quality management and service. Important when your storage is financed.
Bankability report available on request for investors, banks and project partners:
hackmann@bloq42.com · r.weilharter@bloq42.com
Every size, from 233 kWh to 6.25 MWh.
Battery storage is all we do, so we know it in depth. We rely on CLOU Electronics: batteries, inverters, energy management and power plant controller come from one source and are designed to work together.
Commercial storage
One cabinet per unit, freely combinable
Utility-scale storage
Containers for industry, solar parks and the grid
Capacity per unit as stated by the manufacturer. Several units can be combined into larger plants. Bars use a logarithmic scale. Click a model name to open its datasheet.
Peak shaving
The battery steps in when your demand briefly spikes. That lowers the demand charge on your electricity bill.
Self-consumption
Solar power generated at noon is stored and used in the evening instead of being exported cheaply.
Energy trading
Large systems charge when prices are low and discharge when they are high, automatically via a marketer.
A typical day at a commercial site
Switch the storage on and watch it charge at night and absorb the morning and evening peaks.
Example business with a typical load profile. We calculate your figures from your own load data.
Safety, tested under extreme conditions.
Fire safety is the first question for any storage project, for authorities, insurers and neighbours. CLOU systems have been tested to the limit under the supervision of independent test bodies. We prepare the fire safety concept for your site and agree it with the authorities and your building insurer.
59 hours of fire. No spread.
Four 5 MWh containers stood back to back and side by side, as in a real storage park. One container was ignited and burned for more than 59 hours at over 1,300 °C, with no suppression system activated. The fire did not spread to any neighbouring container. CSA Group witnessed and documented the entire test.
In February 2025 the system had already passed the new CSA TS-800 large-scale fire test, with the adjacent units staying below 40 °C.
Large-scale fire test passed
Over 1,300 °C, no spread to neighbouring containers, 2025.
CSA fire test passed
New test standard for densely installed storage, February 2025.
Seismic qualification
Containers rated to the strict US standard for substation equipment.
MTBF certificate
World’s first certification of the reliability of a storage system.
Standards and grid codes
Which certificates apply to which model is shown in each datasheet. Highlighted in copper: grid connection codes for Germany, Europe and Italy. Commercial units come with aerosol fire suppression and smoke and heat detectors as standard.
EU battery passport from 18 February 2027
From that date, every industrial battery over 2 kWh placed on the EU market needs a digital battery passport with a QR code. We clarify the requirements for your project together with the manufacturer and make sure the necessary documents are ready at handover.
Your storage, securely connected.
A modern battery system is connected to the grid and the internet. That makes it controllable, but also vulnerable. On request, we therefore also monitor your system with a cybersecurity solution built specifically for energy assets.
Power and network in view
The solution analyses power data and network traffic together, catching attacks that conventional IT tools miss.
Early warning
Unusual commands or load jumps are detected in real time, before any damage is done to the system or your business.
NIS2 and EU CRA
Automatic compliance assessment and audit-ready reports help you demonstrate regulatory compliance.
Fits your IT
Integrates with common firewall, SIEM and XDR systems. Your IT team keeps its usual overview.
Optional for every storage project. We define the scope in the project check.
SaiFlow won the start-up competition of NextEra Energy, one of the largest energy companies in the US. NextEra Energy Investments subsequently invested in SaiFlow.
SaiFlow works with Audi to secure the cybersecurity of the Audi charging hubs, Audi’s premium charging locations, with NIS2 in mind.
Works with the security systems many companies already use.
Cybersecurity technology partner: SaiFlow, specialised in protecting distributed energy assets such as battery storage, solar plants and charging infrastructure.
Request security adviceStorage from the Midea Group. Everything else from one partner.
A battery system works for you for 15 years and more. So besides first-class technology, what matters most is who looks after it. We handle everything: planning, permits and applications, installation, commissioning, and service and maintenance over the whole lifetime.
Personal, in your language
You talk to people in your language and your time zone who know your project from day one.
Trained on our systems
Our team knows the CLOU systems in detail. Whoever installed your system also services it, so no stranger has to get up to speed first.
Remote monitoring
The energy management system reports anomalies early, often before you notice anything yourself.
Warranty without detours
In a warranty case we sort everything out directly with CLOU. You never have to negotiate with the manufacturer.
Spare parts in Europe
CLOU runs a spare parts warehouse in Poland and its own service team for Europe. That shortens downtime.
Acceptance with the manufacturer
Factory acceptance, commissioning and capacity testing follow a fixed protocol, together with CLOU.
| Without a service partner | With BLOQ42 | |
|---|---|---|
| Contact | Central manufacturer hotline | BLOQ42, one contract for everything |
| Language | Usually English only | German, French, Italian, English |
| On-site technician | Has to be found first | Our team, trained on CLOU systems |
| Warranty case | You negotiate yourself | We coordinate with CLOU |
| Maintenance | Organise it yourself | From one partner |
Everything from one partner.
One contract, one contact, one team: BLOQ42 plans and delivers, CLOU supplies and guarantees. You only deal with us.
CLOU Electronics
Supplies batteries, inverters and energy management and stands behind the warranty.
BLOQ42
Analyses your needs, sizes the system and supports you through to the order.
Our team
Specially trained on CLOU systems. Handles planning, permits and applications, installation, and service and maintenance for BLOQ42.
- Needs analysis and quotationWe analyse your load data and prepare a fixed-price quotation with a business case.BLOQ42
- Planning and sizingSite analysis, sizing, electrical and plant design.BLOQ42
- PermittingBuilding permit, fire safety concept, coordination with authorities.BLOQ42
- Applications and grid connectionGrid connection request to the network operator, subsidy applications, registrations.BLOQ42
- InstallationDelivery, mounting, cabling and connection to the grid.BLOQ42
- Commissioning and acceptanceCommissioning together with CLOU, acceptance report, training, handover of all documents.BLOQ42 with CLOU
- Service and maintenanceScheduled maintenance, on-site troubleshooting, cybersecurity on request, over the entire lifetime.BLOQ42 with CLOU
References.
Our projects in Germany and our manufacturer’s projects in Europe and worldwide.
Mertik tower: from lost place to energy and technology hub
Together with I KUBUS GmbH, a tower block that stood empty for decades is becoming a site that generates and stores power, charges vehicles and will supply a data centre. The CLOU battery systems stand on the ground floor; a dedicated transformer station is already connected to the municipal grid.
“A flagship for the town.”Frank Ruch, Mayor of Quedlinburg, in Mitteldeutsche Zeitung, 20 August 2026 (translated)
Status: nearing completion. The data centre is the next expansion step.
PAUSE42: truck charging without throttling
A fast-charging hub for electric trucks where every charge point keeps its full power, even when all are charging at once. This is made possible by a large battery that supplies the peak while the grid connection recharges it steadily. Storage technology by BLOQ42.
Projects by the manufacturer CLOU
A selection of what CLOU Electronics has already built or contracted, from commercial units to gigawatt-hour projects.
- 280 MW / 1,123 MWh🇧🇦 Bosnia and HerzegovinaLargest single storage project in southern Europe, solar plus storage, under constructionEurope, utility-scale
- 306 MWh🇬🇷 GreeceCLOU’s first utility project in Europe, 126 MWh delivered, 180 MWh orderedEurope, utility-scale
- 230 MWh🇧🇬 BulgariaGrid storage, CLOU’s first string-inverter project in Europe, 2026Europe, utility-scale
- 80 MW / 200 MWh🇦🇱 AlbaniaSolar plus 2-hour storage, under constructionEurope, utility-scale
- 10 MW / 20 MWh🇷🇸 SerbiaSolar plus storage for spot market and frequency regulation, under constructionEurope, utility-scale
- 5.02 MW / 18.75 MWh🇪🇸 SpainSolar plus 2-hour storage, under constructionEurope, utility-scale
- 14.2 MWh🇵🇱 PolandGrid storage, under constructionEurope, utility-scale
- 5 MW / 10 MWh🇲🇰 North MacedoniaCLOU’s first grid-connected project in Europe, on-site commissioning in just two weeks, 2025Europe, utility-scale
- 5 MW / 10 MWh🇫🇷 FranceWind plus storage, under constructionEurope, utility-scale
- 3.5 MW / 7.4 MWh🇷🇴 RomaniaGrid storage for peak shaving and load shifting, under constructionEurope, utility-scale
- Commercial🇧🇬 BulgariaPeak shaving, load shifting and solar integration at an industrial plantEurope, commercial
- Commercial🇳🇱 NetherlandsSelf-consumption, solar integration and flexible energy management in industryEurope, commercial
- Commercial🇵🇱 PolandSolar plus storage for energy tradingEurope, commercial
- 1,000 MW / 2,000 MWh🇨🇳 China, NingxiaLargest single electrochemical storage plant in the provinceWorldwide, utility-scale
- 250 MW / 1,000 MWh🇨🇳 China, Inner MongoliaGrid storage with frequency and voltage regulation and black-start capabilityWorldwide, utility-scale
- 200 MW / 800 MWh🇺🇸 USA, IdahoGrid storage for energy trading, 2026Worldwide, utility-scale
- 765 MWh🇺🇸 USA, MississippiLargest storage capacity in the state, 2024Worldwide, utility-scale
- 270 MWh🇺🇸 USA, CaliforniaDelivered to the strict IEEE 693-H and UL 9540 standards, 2024Worldwide, utility-scale
- 110.2 MWh🇺🇸 USA, IndianaFirst lithium-ion utility storage in the state, 2023Worldwide, utility-scale
- 100 MWh🇺🇸 USA, TexasAll sites in the top 30 by revenue in TexasWorldwide, utility-scale
- Microgrid🇺🇸 USA, HawaiiGrid-connected solar and storage microgrid, first commercial VSG project in the USWorldwide, utility-scale
- Microgrid🇵🇷 Puerto RicoStorage project for island supplyWorldwide, utility-scale
- 2 MW / 8 MWh🇯🇵 Japan, AichiPrimary frequency control with Aqua-C2.5S mini on just 240 m², on-site installation in three days, 2025Worldwide, utility-scale
- 105 MW / 420 MWh🇨🇱 Chile, TarapacáSolar plus storage in extreme heat and desert dustWorldwide, utility-scale
- 63 MWh🇦🇷 Argentina, CatamarcaMicrogrid for a lithium mine at 4,100 m altitude, 2024Worldwide, utility-scale
- Utility-scale🇨🇷 Costa Rica, GuanacasteStorage for a wind farmWorldwide, utility-scale
- Off-grid🇷🇼 RwandaOff-grid system, in operation since 2018Worldwide, utility-scale
- Commercial🇿🇼 ZimbabweOptimised energy use at a factory through battery storageWorldwide, commercial
- Commercial🇹🇭 ThailandSolar integration, charging infrastructure and self-consumptionWorldwide, commercial
CLOU Electronics projects according to the manufacturer’s company profile, 2026. Awarded: Aqua-E261 and Aqua-X261 at Solar Energy Expo Warsaw 2026 in the energy storage category. BLOQ42 is delivering the Quedlinburg pilot project together with I KUBUS.
Datasheets.
Technical data for every system in English, German, French and Italian. Save any datasheet as a PDF and pass it on.
Full manufacturer documentation and certificates are available on request.
What does storage deliver?
A first estimate of your annual savings. We calculate the exact figures with your real load data.
- From shaved peaks
- From higher self-consumption
Rough estimate, no guarantee. We calculate investment and payback in the quotation.
Request an exact calculationFrequently asked questions
What is the difference between kW and kWh?
Power in kW determines how fast the battery absorbs or releases energy. Capacity in kWh determines how much it stores in total. An Aqua-E261, for example, delivers 125 kW for about two hours until its 261 kWh are used. For peak shaving, power matters most; for shifting solar power into the evening, capacity matters most. We match the ratio of both to your load profile.
What size of storage do I need?
The basis is your load profile in 15-minute resolution over at least twelve months, available from your network or metering operator. From it we determine how high and how long your peaks are, how much solar surplus you have and which combination of power and capacity pays back fastest. A system that is too large ties up capital; one that is too small leaves savings on the table.
When does storage pay off?
Usually when several revenue streams come together: a lower demand charge, higher self-consumption and marketing of spare capacity. We calculate payback and net present value with your real consumption and tariff data, not with averages.
How safe is a battery system in case of fire?
The systems use lithium iron phosphate (LFP) cells, which are considered particularly thermally stable. Every unit has its own fire detection and suppression. CLOU containers have also passed the CSA TS-800 large-scale fire test and a 59-hour fire test without the fire spreading to neighbouring containers. We prepare a fire safety concept for your site and agree it with the authorities and your building insurer.
What does the EU battery passport mean for me?
From 18 February 2027, every industrial battery over 2 kWh placed on the EU market needs a digital battery passport. It is accessed via a QR code and includes information on the manufacturer, composition, carbon footprint and condition, among other things. We clarify the requirements for your project with the manufacturer and hand over the documents with the system.
Who plans and installs the system?
We do, everything from one partner. Our team, specially trained on CLOU systems, handles electrical design, permits and applications, installation and on-time commissioning, and looks after your system afterwards. We remain your contractual partner and contact for everything.
How long until commissioning?
Delivery time depends on model and quantity and is usually several months. Planning and the grid connection process run in parallel. For medium-voltage systems, the connection process is often the critical path. You receive a binding schedule with the quotation.
Which grid connection rules apply?
In Germany, VDE-AR-N 4105 applies to low-voltage systems and VDE-AR-N 4110 to medium-voltage systems, with unit and, where required, plant certificates. We provide the evidence your project needs and coordinate the process with your network operator. For Switzerland, we clarify your distribution network operator’s requirements project by project.
Can the system be controlled remotely and marketed?
Yes. The energy management system communicates both ways with the control boxes of direct marketers and aggregators. Active and reactive power setpoints, state of charge and schedules are transmitted automatically. The system can therefore take part in energy trading without manual intervention and, after prequalification, provide balancing power.
What happens if the system has a fault?
The energy management system reports faults via remote monitoring. Our team analyses them, fixes them remotely where possible and otherwise sends a technician who already knows your system. We handle spare parts and warranty claims directly with CLOU. Your contact speaks your language.
Is my system protected against cyber attacks?
Every connected storage system is a potential target. On request we add cybersecurity monitoring built specifically for energy assets. It links power and network data, detects attacks early and delivers reports for NIS2 and the EU Cyber Resilience Act. We agree the right scope in the project check.
Who is responsible for warranty and service?
The manufacturer’s warranty is provided by CLOU Electronics and thus by the Midea Group, an A-rated group. Remote monitoring, maintenance and on-site troubleshooting are handled by our trained team. We coordinate warranty cases directly with the manufacturer, so you only need one contact.
For electrical and solar installers: become a service partner.
We are building a network of trained installers in Switzerland, Germany and Austria who install and service BLOQ42 storage systems. You bring the craftsmanship, we bring the storage, the projects and the line to the manufacturer.
Training on CLOU systems
Technical training for installation, commissioning and maintenance by our team.
Projects from our sales
We bring you storage projects in your region, from planning to maintenance contract.
Purchasing via BLOQ42
You source storage, accessories and spare parts through us; we handle warranty cases with CLOU for you.
Technical backing
Remote access, a spare parts warehouse in Europe and a contact when things get stuck on site.
Request sent.
Thank you. We will review your details and get back to you within one working day.
Legal notice
Provider of this website
DRW Communications AGHaslacherweg 11
8213 Neunkirch
Switzerland
BLOQ42 is a brand of DRW Communications AG.
Represented by
René Weilharter, Managing Director
Commercial register
Commercial Register Office of the Canton of Schaffhausen
Company number CH-290.3.013.242-1
UID CHE-105.215.904
Contact
Phone +41 76 602 03 88
Email info@bloq42.com
Responsible for content
Joseph Hackmann, Managing Director BLOQ42, address as above
Liability
The content of this website is prepared with care. Technical data and project details are based on manufacturer information and may change. Only our written quotations are binding. The operators of linked websites are responsible for their content. In case of doubt, the German version of this legal notice prevails.
Privacy
Controller
DRW Communications AG, Haslacherweg 11, 8213 Neunkirch, Switzerland, info@bloq42.com. We process personal data in accordance with the Swiss Federal Act on Data Protection (FADP) and, where applicable, the EU General Data Protection Regulation (GDPR).
Project check and enquiries
When you contact us via the project check or by email, we store your details and uploaded files to process your enquiry and prepare a quotation. For sizing and installation, we pass the necessary project data to our planning and installation partners, to the manufacturer and, if cybersecurity monitoring is requested, to SaiFlow. The legal basis is the preparation of a contract. We delete the data when it is no longer needed and no statutory retention obligation applies.
Hosting
This website is hosted by Netlify, Inc., USA. On our behalf, Netlify processes the data technically required when you visit, such as IP address and time of access, and stores the details and files from the project check until we have processed them. Data may be transferred to the USA on the basis of standard contractual clauses or equivalent safeguards. Alternatively, you can write to us directly at info@bloq42.com.
Fonts
The font on this website is loaded from Google Fonts. Your IP address is transmitted to Google in the process.
Your rights
You can request information about your data and ask for it to be corrected or deleted. Please write to info@bloq42.com. You also have the right to lodge a complaint with the Swiss Federal Data Protection and Information Commissioner (FDPIC) or a competent supervisory authority in the EU.
Last updated: November 2026