BLOQ42 powered by CLOU · Midea Group

Your battery storage specialist.

For commercial and industrial sites, from 233 kWh to 6.25 MWh per unit. We do it all: sizing, planning, permits and applications, installation, service and maintenance. One partner for everything, with systems by CLOU Electronics of the Midea Group.

Solar and grid Your business
Charging
3 × 261 kWh, 783 kWh in total
40 %

The Midea Group stands behind every system.

A battery storage system runs for 15 years and more. A warranty is only worth as much as the manufacturer who can still honour it 15 years from now. CLOU Electronics belongs to the Midea Group, one of the world’s largest technology groups, which also owns the German robot maker KUKA.

Midea Group›CLOU Electronics›BLOQ42
No. 231Fortune Global 500, 2026
$64.3 bnGroup revenue 2025
190,000Employees in over 200 countries
ACredit rating by S&P and Fitch

Source: Midea Group.

TÜV SÜD Technical Due Diligence, 2026 BloombergNEF Tier 1 storage and PCS, 2024 and 2025 DNV bankability report for Aqua-C2.5 BNEF bankability list World’s first MTBF certification by DEKRA TÜV SÜD witness laboratory ISO 9001 · 14001 · 45001 · 50001 · 27001
Independently assessed. Built to be bankable.

In 2026, TÜV SÜD assessed five CLOU storage systems, including Aqua-E261 and Aqua-C3.0, in an independent technical due diligence covering technology, manufacturing, quality management and service. Important when your storage is financed.

Bankability report available on request for investors, banks and project partners:
hackmann@bloq42.com · r.weilharter@bloq42.com

Every size, from 233 kWh to 6.25 MWh.

Battery storage is all we do, so we know it in depth. We rely on CLOU Electronics: batteries, inverters, energy management and power plant controller come from one source and are designed to work together.

Commercial storage

One cabinet per unit, freely combinable

Aqua-E233
233 kWh
110 kW, all-in-one cabinet
Aqua-E261
261 kWh
125 kW, all-in-one cabinet
Aqua-X261
261 kWh
125 kW, with direct PV input

Utility-scale storage

Containers for industry, solar parks and the grid

Aqua-C2.5 Mini
2 or 2.5 MWh
10-foot container, also for large businesses
Aqua-C2.5
5.015 MWh
Containerised utility storage
Aqua-C3.0 Ultra
5.154 MWh
Compact, under 15 feet, grid-forming
Aqua-C3.0
6.25 MWh
Largest unit per container

Capacity per unit as stated by the manufacturer. Several units can be combined into larger plants. Bars use a logarithmic scale. Click a model name to open its datasheet.

Peak shaving

The battery steps in when your demand briefly spikes. That lowers the demand charge on your electricity bill.

Self-consumption

Solar power generated at noon is stored and used in the evening instead of being exported cheaply.

Energy trading

Large systems charge when prices are low and discharge when they are high, automatically via a marketer.

A typical day at a commercial site

Switch the storage on and watch it charge at night and absorb the morning and evening peaks.

800600400200 00:0006:0012:0018:0024:00 kW New ceiling 500 kW
Peak demand720 kW
Annual demand charge at €120/kW€86,400

Example business with a typical load profile. We calculate your figures from your own load data.

Safety, tested under extreme conditions.

Fire safety is the first question for any storage project, for authorities, insurers and neighbours. CLOU systems have been tested to the limit under the supervision of independent test bodies. We prepare the fire safety concept for your site and agree it with the authorities and your building insurer.

Large-scale fire test · Aqua-C2.5

59 hours of fire. No spread.

Four 5 MWh containers stood back to back and side by side, as in a real storage park. One container was ignited and burned for more than 59 hours at over 1,300 °C, with no suppression system activated. The fire did not spread to any neighbouring container. CSA Group witnessed and documented the entire test.

In February 2025 the system had already passed the new CSA TS-800 large-scale fire test, with the adjacent units staying below 40 °C.

> 1,300 °C no spread no spread no spread 4 × 5 MWh · 59 h 10 min · witnessed by CSA Group
59 h

Large-scale fire test passed

Over 1,300 °C, no spread to neighbouring containers, 2025.

TS-800

CSA fire test passed

New test standard for densely installed storage, February 2025.

IEEE 693

Seismic qualification

Containers rated to the strict US standard for substation equipment.

DEKRA

MTBF certificate

World’s first certification of the reliability of a storage system.

Standards and grid codes

CEIEC 62619IEC 63056IEC 62477-1IEC 62933IEC 61000UN 38.3UL 9540UL 9540AUL 1973NFPA 855 VDE-AR-N 4110VDE-AR-N 4120EN 50549CEI 0-16

Which certificates apply to which model is shown in each datasheet. Highlighted in copper: grid connection codes for Germany, Europe and Italy. Commercial units come with aerosol fire suppression and smoke and heat detectors as standard.

EU battery passport from 18 February 2027

From that date, every industrial battery over 2 kWh placed on the EU market needs a digital battery passport with a QR code. We clarify the requirements for your project together with the manufacturer and make sure the necessary documents are ready at handover.

Your storage, securely connected.

A modern battery system is connected to the grid and the internet. That makes it controllable, but also vulnerable. On request, we therefore also monitor your system with a cybersecurity solution built specifically for energy assets.

Power and network in view

The solution analyses power data and network traffic together, catching attacks that conventional IT tools miss.

Early warning

Unusual commands or load jumps are detected in real time, before any damage is done to the system or your business.

NIS2 and EU CRA

Automatic compliance assessment and audit-ready reports help you demonstrate regulatory compliance.

Fits your IT

Integrates with common firewall, SIEM and XDR systems. Your IT team keeps its usual overview.

Optional for every storage project. We define the scope in the project check.

Investor
Backed by NextEra Energy

SaiFlow won the start-up competition of NextEra Energy, one of the largest energy companies in the US. NextEra Energy Investments subsequently invested in SaiFlow.

Collaboration
Audi AG

SaiFlow works with Audi to secure the cybersecurity of the Audi charging hubs, Audi’s premium charging locations, with NIS2 in mind.

Integrates with
Check PointPalo Alto NetworksFortinetCrowdStrikeClaroty

Works with the security systems many companies already use.

Cybersecurity technology partner: SaiFlow, specialised in protecting distributed energy assets such as battery storage, solar plants and charging infrastructure.

Request security advice

Storage from the Midea Group. Everything else from one partner.

A battery system works for you for 15 years and more. So besides first-class technology, what matters most is who looks after it. We handle everything: planning, permits and applications, installation, commissioning, and service and maintenance over the whole lifetime.

Personal, in your language

You talk to people in your language and your time zone who know your project from day one.

Trained on our systems

Our team knows the CLOU systems in detail. Whoever installed your system also services it, so no stranger has to get up to speed first.

Remote monitoring

The energy management system reports anomalies early, often before you notice anything yourself.

Warranty without detours

In a warranty case we sort everything out directly with CLOU. You never have to negotiate with the manufacturer.

Spare parts in Europe

CLOU runs a spare parts warehouse in Poland and its own service team for Europe. That shortens downtime.

Acceptance with the manufacturer

Factory acceptance, commissioning and capacity testing follow a fixed protocol, together with CLOU.

Without a service partnerWith BLOQ42
ContactCentral manufacturer hotlineBLOQ42, one contract for everything
LanguageUsually English onlyGerman, French, Italian, English
On-site technicianHas to be found firstOur team, trained on CLOU systems
Warranty caseYou negotiate yourselfWe coordinate with CLOU
MaintenanceOrganise it yourselfFrom one partner

Everything from one partner.

One contract, one contact, one team: BLOQ42 plans and delivers, CLOU supplies and guarantees. You only deal with us.

Manufacturer, part of the Midea Group

CLOU Electronics

Supplies batteries, inverters and energy management and stands behind the warranty.

Storage specialist

BLOQ42

Analyses your needs, sizes the system and supports you through to the order.

Planning, installation and service

Our team

Specially trained on CLOU systems. Handles planning, permits and applications, installation, and service and maintenance for BLOQ42.

  1. Needs analysis and quotationWe analyse your load data and prepare a fixed-price quotation with a business case.
    BLOQ42
  2. Planning and sizingSite analysis, sizing, electrical and plant design.
    BLOQ42
  3. PermittingBuilding permit, fire safety concept, coordination with authorities.
    BLOQ42
  4. Applications and grid connectionGrid connection request to the network operator, subsidy applications, registrations.
    BLOQ42
  5. InstallationDelivery, mounting, cabling and connection to the grid.
    BLOQ42
  6. Commissioning and acceptanceCommissioning together with CLOU, acceptance report, training, handover of all documents.
    BLOQ42 with CLOU
  7. Service and maintenanceScheduled maintenance, on-site troubleshooting, cybersecurity on request, over the entire lifetime.
    BLOQ42 with CLOU

References.

Our projects in Germany and our manufacturer’s projects in Europe and worldwide.

Quedlinburg, Saxony-Anhalt, Germany

Mertik tower: from lost place to energy and technology hub

Together with I KUBUS GmbH, a tower block that stood empty for decades is becoming a site that generates and stores power, charges vehicles and will supply a data centre. The CLOU battery systems stand on the ground floor; a dedicated transformer station is already connected to the municipal grid.

500 kWpPhotovoltaics across the entire façade
2 MWData centre planned over three floors
CLOUBattery storage on the ground floor for maximum self-use
Since 2025under way, partner Stadtwerke Quedlinburg
“A flagship for the town.”
Frank Ruch, Mayor of Quedlinburg, in Mitteldeutsche Zeitung, 20 August 2026 (translated)
Solar facade Data centre (planned) CLOU storage Transformer Charging

Status: nearing completion. The data centre is the next expansion step.

Baden-Württemberg, Germany · e-truck charging hub

PAUSE42: truck charging without throttling

A fast-charging hub for electric trucks where every charge point keeps its full power, even when all are charging at once. This is made possible by a large battery that supplies the peak while the grid connection recharges it steadily. Storage technology by BLOQ42.

Project in preparation
6truck charge points
up to 400 kWper charge point, undivided
Batterycovers the peak, connection stays
SLOT42book charging slots online
How storage works in a charging park →
23+ GWhstorage contracted worldwide
2+ GWhof which in Europe
30 yearspower electronics, storage since 2009
Tier 1storage and PCS manufacturer according to BloombergNEF

Projects by the manufacturer CLOU

A selection of what CLOU Electronics has already built or contracted, from commercial units to gigawatt-hour projects.

  • 280 MW / 1,123 MWh
    🇧🇦 Bosnia and HerzegovinaLargest single storage project in southern Europe, solar plus storage, under construction
    Europe, utility-scale
  • 306 MWh
    🇬🇷 GreeceCLOU’s first utility project in Europe, 126 MWh delivered, 180 MWh ordered
    Europe, utility-scale
  • 230 MWh
    🇧🇬 BulgariaGrid storage, CLOU’s first string-inverter project in Europe, 2026
    Europe, utility-scale
  • 80 MW / 200 MWh
    🇦🇱 AlbaniaSolar plus 2-hour storage, under construction
    Europe, utility-scale
  • 10 MW / 20 MWh
    🇷🇸 SerbiaSolar plus storage for spot market and frequency regulation, under construction
    Europe, utility-scale
  • 5.02 MW / 18.75 MWh
    🇪🇸 SpainSolar plus 2-hour storage, under construction
    Europe, utility-scale
  • 14.2 MWh
    🇵🇱 PolandGrid storage, under construction
    Europe, utility-scale
  • 5 MW / 10 MWh
    🇲🇰 North MacedoniaCLOU’s first grid-connected project in Europe, on-site commissioning in just two weeks, 2025
    Europe, utility-scale
  • 5 MW / 10 MWh
    🇫🇷 FranceWind plus storage, under construction
    Europe, utility-scale
  • 3.5 MW / 7.4 MWh
    🇷🇴 RomaniaGrid storage for peak shaving and load shifting, under construction
    Europe, utility-scale
  • Commercial
    🇧🇬 BulgariaPeak shaving, load shifting and solar integration at an industrial plant
    Europe, commercial
  • Commercial
    🇳🇱 NetherlandsSelf-consumption, solar integration and flexible energy management in industry
    Europe, commercial
  • Commercial
    🇵🇱 PolandSolar plus storage for energy trading
    Europe, commercial
  • 1,000 MW / 2,000 MWh
    🇨🇳 China, NingxiaLargest single electrochemical storage plant in the province
    Worldwide, utility-scale
  • 250 MW / 1,000 MWh
    🇨🇳 China, Inner MongoliaGrid storage with frequency and voltage regulation and black-start capability
    Worldwide, utility-scale
  • 200 MW / 800 MWh
    🇺🇸 USA, IdahoGrid storage for energy trading, 2026
    Worldwide, utility-scale
  • 765 MWh
    🇺🇸 USA, MississippiLargest storage capacity in the state, 2024
    Worldwide, utility-scale
  • 270 MWh
    🇺🇸 USA, CaliforniaDelivered to the strict IEEE 693-H and UL 9540 standards, 2024
    Worldwide, utility-scale
  • 110.2 MWh
    🇺🇸 USA, IndianaFirst lithium-ion utility storage in the state, 2023
    Worldwide, utility-scale
  • 100 MWh
    🇺🇸 USA, TexasAll sites in the top 30 by revenue in Texas
    Worldwide, utility-scale
  • Microgrid
    🇺🇸 USA, HawaiiGrid-connected solar and storage microgrid, first commercial VSG project in the US
    Worldwide, utility-scale
  • Microgrid
    🇵🇷 Puerto RicoStorage project for island supply
    Worldwide, utility-scale
  • 2 MW / 8 MWh
    🇯🇵 Japan, AichiPrimary frequency control with Aqua-C2.5S mini on just 240 m², on-site installation in three days, 2025
    Worldwide, utility-scale
  • 105 MW / 420 MWh
    🇨🇱 Chile, TarapacáSolar plus storage in extreme heat and desert dust
    Worldwide, utility-scale
  • 63 MWh
    🇦🇷 Argentina, CatamarcaMicrogrid for a lithium mine at 4,100 m altitude, 2024
    Worldwide, utility-scale
  • Utility-scale
    🇨🇷 Costa Rica, GuanacasteStorage for a wind farm
    Worldwide, utility-scale
  • Off-grid
    🇷🇼 RwandaOff-grid system, in operation since 2018
    Worldwide, utility-scale
  • Commercial
    🇿🇼 ZimbabweOptimised energy use at a factory through battery storage
    Worldwide, commercial
  • Commercial
    🇹🇭 ThailandSolar integration, charging infrastructure and self-consumption
    Worldwide, commercial

CLOU Electronics projects according to the manufacturer’s company profile, 2026. Awarded: Aqua-E261 and Aqua-X261 at Solar Energy Expo Warsaw 2026 in the energy storage category. BLOQ42 is delivering the Quedlinburg pilot project together with I KUBUS.

What does storage deliver?

A first estimate of your annual savings. We calculate the exact figures with your real load data.

Reduce your maximum demand by this many kW.
Shown on your electricity bill, in € per kW and year.
Energy exported today that would be stored in future.
In cents per kWh.
Estimated annual savings
From shaved peaks
From higher self-consumption

Rough estimate, no guarantee. We calculate investment and payback in the quotation.

Request an exact calculation

Frequently asked questions

What is the difference between kW and kWh?

Power in kW determines how fast the battery absorbs or releases energy. Capacity in kWh determines how much it stores in total. An Aqua-E261, for example, delivers 125 kW for about two hours until its 261 kWh are used. For peak shaving, power matters most; for shifting solar power into the evening, capacity matters most. We match the ratio of both to your load profile.

What size of storage do I need?

The basis is your load profile in 15-minute resolution over at least twelve months, available from your network or metering operator. From it we determine how high and how long your peaks are, how much solar surplus you have and which combination of power and capacity pays back fastest. A system that is too large ties up capital; one that is too small leaves savings on the table.

When does storage pay off?

Usually when several revenue streams come together: a lower demand charge, higher self-consumption and marketing of spare capacity. We calculate payback and net present value with your real consumption and tariff data, not with averages.

How safe is a battery system in case of fire?

The systems use lithium iron phosphate (LFP) cells, which are considered particularly thermally stable. Every unit has its own fire detection and suppression. CLOU containers have also passed the CSA TS-800 large-scale fire test and a 59-hour fire test without the fire spreading to neighbouring containers. We prepare a fire safety concept for your site and agree it with the authorities and your building insurer.

What does the EU battery passport mean for me?

From 18 February 2027, every industrial battery over 2 kWh placed on the EU market needs a digital battery passport. It is accessed via a QR code and includes information on the manufacturer, composition, carbon footprint and condition, among other things. We clarify the requirements for your project with the manufacturer and hand over the documents with the system.

Who plans and installs the system?

We do, everything from one partner. Our team, specially trained on CLOU systems, handles electrical design, permits and applications, installation and on-time commissioning, and looks after your system afterwards. We remain your contractual partner and contact for everything.

How long until commissioning?

Delivery time depends on model and quantity and is usually several months. Planning and the grid connection process run in parallel. For medium-voltage systems, the connection process is often the critical path. You receive a binding schedule with the quotation.

Which grid connection rules apply?

In Germany, VDE-AR-N 4105 applies to low-voltage systems and VDE-AR-N 4110 to medium-voltage systems, with unit and, where required, plant certificates. We provide the evidence your project needs and coordinate the process with your network operator. For Switzerland, we clarify your distribution network operator’s requirements project by project.

Can the system be controlled remotely and marketed?

Yes. The energy management system communicates both ways with the control boxes of direct marketers and aggregators. Active and reactive power setpoints, state of charge and schedules are transmitted automatically. The system can therefore take part in energy trading without manual intervention and, after prequalification, provide balancing power.

What happens if the system has a fault?

The energy management system reports faults via remote monitoring. Our team analyses them, fixes them remotely where possible and otherwise sends a technician who already knows your system. We handle spare parts and warranty claims directly with CLOU. Your contact speaks your language.

Is my system protected against cyber attacks?

Every connected storage system is a potential target. On request we add cybersecurity monitoring built specifically for energy assets. It links power and network data, detects attacks early and delivers reports for NIS2 and the EU Cyber Resilience Act. We agree the right scope in the project check.

Who is responsible for warranty and service?

The manufacturer’s warranty is provided by CLOU Electronics and thus by the Midea Group, an A-rated group. Remote monitoring, maintenance and on-site troubleshooting are handled by our trained team. We coordinate warranty cases directly with the manufacturer, so you only need one contact.

For electrical and solar installers: become a service partner.

We are building a network of trained installers in Switzerland, Germany and Austria who install and service BLOQ42 storage systems. You bring the craftsmanship, we bring the storage, the projects and the line to the manufacturer.

Training on CLOU systems

Technical training for installation, commissioning and maintenance by our team.

Projects from our sales

We bring you storage projects in your region, from planning to maintenance contract.

Purchasing via BLOQ42

You source storage, accessories and spare parts through us; we handle warranty cases with CLOU for you.

Technical backing

Remote access, a spare parts warehouse in Europe and a contact when things get stuck on site.

Send partner enquiry or call: +41 76 602 03 88

Contact and goalStep 1 of 3
Contact and goal
Are other service providers involved in the project?