Charging parks · Logistics · Fuel stations

Your trucks want to charge.
Your grid connection can’t cope.

The BLOQ42 battery supplies the power your connection lacks. Fast charging now, instead of waiting for a grid upgrade.

Charging hub simulation6 charge points · 500 kW connection
Charging power
420 kW
From the grid
420 kW
From the battery
0 kW
State of charge
96 %

The white line shows the 500 kW grid limit. Everything above it comes from the battery.

The principle

The battery is your reservoir.

The grid is a river with limited flow. The battery fills slowly and releases a surge when needed. So several trucks charge at full power at once, even though your connection only manages a fraction of that.

From the grid

500 kW

Existing connection, evenly loaded.

At the charge point

up to 1,440 kW

Peak charging power, because the battery supplies the difference.

Who it’s for

Wherever high power meets a small connection.

Logistics

Truck depots

The fleet charges at shift changes and needs top-ups. We supply the peak, your connection stays as it is.

Mobility

Fuel stations & service areas

Short stops, high peaks. Fast charging on the existing connection, without waiting for the grid.

Hospitality

Hotels, restaurants, retail

Guests charge while they eat or shop. With ChargePost, you also earn advertising revenue on the display.

Four revenue streams

One battery that works four times over.

Grid tariff

Cheaper tariff

Constant load instead of peaks: in Germany, the energy price drops significantly above 2,500 utilisation hours.

Connection

No grid upgrade

No connection contribution and no new transformer station, and you start as soon as the battery is in place.

Trading

Energy trading

With a dynamic tariff, charge when cheap and use when expensive.

Future

Grid services

Offer flexibility as part of a swarm. A future bonus, not included in the calculation.

Sample calculation · truck charging hub, Baden-Württemberg

Almost €90,000 less in grid costs. Every year.

−40 %grid fees, from around €222,000 to €133,000 a year
€89,000benefit per year after storage losses and maintenance
7.3 yearspayback of the additional investment versus a grid upgrade
0waiting time for the grid, start with the existing connection

Sample calculation: 6 truck charge points at 400 kW, 1,200 kWh per charge point and day, 500 kW connection, 2.1 MWh battery at €400/kWh installed, grid fees Stuttgart Netze 2026 (medium voltage). Not a quotation. Other network operators have their own prices; levies and charges are not included.

Honestly planned

Smart charging first. Then storage.

Not every site needs a large battery. So we first check how much smart charge management alone can achieve, and size the battery only for the peak that remains. That way you don’t pay for a single kilowatt-hour too many.

1 · Measure the load profile

2 · Optimise charge management

3 · Battery for the remaining peak